Our Objectives
1- Technical
To define and simulate future fossil fuel power plants’ work-flows and scenarios for advanced and complex flexible demand operations with massive renewable integration in the network…
2- Economic
Enabling market uptake and industrial deployment of sCO2 Brayton cycle from 2025 to establish sCO2 Brayton cycle as optimal fossil fuel power plants’ solution in terms of costs through optimized design and components’ integration…
3- Environmental
Mitigating fossil fuel plants’ environmental impact and foster sCO2 technology’s acceptance to reduce water consumption by 100% by avoiding the use of water in the thermodynamic cycle loop/heat rejection section with air-cooling and thus enabling geographical flexibility.